Construction of 1484 Dus (G plus 3 Floors) adopting Monolithic Shear Wall Design only (cast-in-situ, Single Pour Technology with single stage Aluminum Shuttering only) and Providing Infrastructures works at Alarwad Sy.No. 241/B and Wadagavi Village Sy.No.215/7 Belagavi Taluk, Karnataka Under PMAY(U)-HFA (Fixed Price No Variation.
Design, Supply, Installation, Testing and Commissioning (DSITC) of VRF based air-conditioning system for ITBP billets at Reserve Bank of India’s Main Office Building in Chandigarh.