"Supply of 5.0 lakh Metric Tonnes (3.0 Lakh Metric Tonnes for Dr. NTTPS and 2.0 Lakh Metric Tonnes for Dr.M.V.R RTPP) of Imported Non coking (Steam) coal on FOR destination basis to Dr. NTTPS & Dr.M.V.R RTPP Thermal Power Plants, Andhra Pradesh, India."
Providing Insurance coverage on Reinstatement values to the assets of Stage- I & II of SDSTPS and standalone policies on Public liability (Industrial & Act only) & Terrorism coverage for entire plant of SDSTPS for a period of one year i.e from 00:00 Hrs on 04.02.2024 to 24:00 Hrs on 03.02.2025
"Transportation of 80.0 Lakh MT (40.0 Lakh MT per Annum) of Raw coal from M/s. Mahanadi coalfields Ltd, Talcher or Washed coal from M/s. ACB (India) Limited washery siding (SSMT)/ any other washery sidings at M/s.MCL, Talcher or part quantity of both raw coal & washed coal to Rayalaseema Thermal Power Project (RTPP), AP on “FOR” destination basis by Rail cum Sea cum Rail (RSR) route via Paradip and Adani Krishnapatnam /Ennore ports for a period of Two years."
Providing of 1No 500 TPH Capacity Mini Crusher (fixed/ movable) on hire basis, feeding of raw coal into crusher unit, crushing of raw coal to an output size of (-) 20 mm at 300 to 500 TPH with minimum output of 1.0 Lakh Ton per Month, transporting of crushed coal to the stock yard of Dr.NTTPS/APGENCO, including Provision, Installation, Operation & Maintenance for a period of 24 months"
"Dr.NTTPS – CHP - Manual unloading of coal from wagons at Road no.4 with Proclainers and transportation of coal from yard near Road no.4 to Stage-IV stock yard through Lorries (0-1KM) for feeding to Unit-8 (800MW)/Stage-V/Dr.NTTPS from the date of commencement of work to 31.03.2024 or completion of quantities whichever is later"